NORTH AMERICAN RACEHORSE

Change Order — Profile, Stats, Records & Form

Full Change Order racing profile · by Vino Rosso · 1 start in the last 30 days. Live morning-line odds, jockey/trainer connections, surface and distance preference — updated daily from official US racing data.

1 start · last 30d Form: 3 By Vino Rosso
Starts 30d
1
Wins
0
Strike rate
0%
In-the-money
100%

Betting tips & form signals

  • FORM Last 5 finishes: 3 (most recent first; U = unplaced/outside top 3).
  • QUICK Quick turn-around: just 2 days since the last run.
  • SURFACE Strong dirt preference: 100% of recent starts on dirt.
  • TRIP Profiles as a sprint specialist (under 7 furlongs) — 100% of recent starts at that trip.

Signals derived from 30-day NA results, pedigree data, and (where available) career-long form from The Racing API. Not betting advice — please gamble responsibly.

Pedigree & connections

SIRE (FATHER)
Vino Rosso
TRAINER
Ilmar Loaiza
LAST JOCKEY
Nazario Alvarado
OWNER
Louis Sirianni
BREEDER
Beals Racing Stable LLC & Saratoga Glen Farm LLC

Recent form — last 30 days

3
Finger Lakes · 27 Jul 2026
R8 · 5 1/2 Furlongs · Dirt · Fast · jockey Nazario Alvarado · trainer Ilmar Loaiza

Recent runs matched by name across the last 30 days of NA results. Horses finishing outside the top three appear as "unplaced" — the NA results endpoint does not publish exact finishing positions for runners outside the top three.

Surface & distance preference

SURFACE
Dirt 1 start · 100%

Strong dirt bias — 100% of recent starts.

DISTANCE
Sprints (under 7f) 1 start · 100%

Optimal trip: sprints (under 7f) — 100% of recent starts.